During the first half of 2026, Artinian Atelier Academy made systematic progress in implementing ISO14001:2015 standards through the establishment of measurable objectives, operational controls, employee involvement, and documented reviews and reporting.
This update clearly records the completed actions that support the continuous improvement strategy.
Artinian Atelier Academy’s electricity consumption per head fell 30.90% in Q1 and 37.39% in Q2, against a 10% target. Paper use declined 29.46% and 41.50%, while tap-water usage dropped 48.34% and 45.69%. All environmental objectives were exceeded.

Our Implementation Team in Action
Project Leader and certified safety engineer Racksack headed the ISO14001:2015 post certification program initiatives with executive assistants: certified safety engineer Thanaporn, and certified environmental science specialist Nicharee. Together, the working team reviewed the internal-audit checklists, organized ISO14001 updates and talks, trained subcontractors, steered and supported committee meetings.
Across Artinian Atelier Academy, the team checked air-conditioning temperatures and waste segregation, replaced the melting-room carbon filters and installed a wet scrubber for the plating room. The wastewater treatment plant was thoroughly inspected, the team tested the fire pump and also monitored the polishing-machine flow rate.
Additionally, upgraded first-aid kits for gem-cutting department, installed step-safety markings, checked hazardous waste logs, tested drinking-water quality, completed pest control and replaced the polishing-machine bag filters.
The Energy Saving Committee strengthened participation and sense of responsibility.



Connecting Completed Work to ISO14001
| Action | Clauses | Implementation requirement |
|---|---|---|
| Resource reductions | 6.2.1, 6.2.2, 9.1.1 | Set objectives, plan actions and analyse performance. |
| Internal audits | 9.2.1, 9.2.2 | Define audit objectives, implement programmes and maintain evidence. |
| Training | 7.2, 7.3, 7.4 | Demonstrate competence, awareness and communication. |
| Scrubber, filters and wastewater | 6.1.2, 6.1.5, 8.1 | Control environmental aspects and operations. |
| Hazardous waste | 6.1.3, 8.1, 9.1.2 | Meet obligations and evaluate compliance. |
| Emergency checks | 8.2 | Maintain and test preparedness. |
Spearheaded by Artinian Co., Ltd. Sustainability Department directives and already aligning to the newer versions of ISO 14001:2026, our team is increasing focus and attention to environmental conditions, life-cycle impacts, external providers, documented information and planned change under clause 6.3.




Artinian Atelier Academy will use this half-year evidence to complete a clause-by-clause gap assessment, update environmental context, confirm interested-party expectations, strengthen supplier controls and align audit records with the new edition.
Monthly KPI reviews and management review will convert evidence into decisions, keeping implementation measurable, accountable and ready for transition.
This is our ISO14001 implementation story: committed Artinian Atelier Academy team, practical controls and verified progress. Sustainability through every action, on or off the bench.
Disclaimer: Content and images in this communication are proprietary to Artinian Co., Ltd. and affiliated entities. Reproduction or distribution without prior written permission is not allowed. For additional information please get in touch via this link.